Engineering Circle Meeting 2024-09-12

Table of Contents


Attendees

  • Lee
  • Mik
  • Sabrina
  • Scott

Main Content and TODO

  • git.ourworld.tf ops
    • TODO
      • Sabrina creates an issue to check how to manage the gitea instance, just like we deal with github instance
    • Notes
      • check the ops process for gitea git.ourworld.tf
        • make sure the process is effective and can be done by different person to avoid bottleneck/SPOF
  • Ops snapshot node

TODISCUSS - Next Meeting

  • To discuss
    • Farmerbot-farmer-minting issue
      • scott will present the issue and we can discuss with Thabet, Jan and Kristof on the call: we can't afford to lose farmers, and the error was on TF side, not the farmers.
      • for now the proposition is (not ideal for farmers, we risk to lose farmers and nodes)
        • make sure it doesn't happen again
          • check with the team who implemented the changes
            • ZOS team
        • can't compensate from treasury
        • can't remint
          • not fair for non-fbot-farmer compared to fbot-farmer
    • Farmers deploying on their own nodes
      • for now they can get up to 90% discount
        • 50% utilization rewards
        • 50% dedicated node
        • 60% staking discount
          • 0.5 * 0.5 * 0.4 = 0.1
      • If TFT price goes up, farmers can rent their full node and still farm TFT
        • not sustainable
          • starting from 2 cents tft
            • farmers can make more money by renting the whole node and still farm
      • Discussion
        • how can we make sure this isn't happening for ZOS v4
        • we'd need a GEP to change the discount and rewards
    • info_grid manual (github) to info_tfgrid manual (git.ourworld.tf) migration
      • discuss how to do this smoothly
        • e.g.
          • replace info_grid manual by info_tfgrid manual on manual.grid.tf
      • OR we wait for the new markdown docs app?
    • GEP TFT Voting
      • Reference: https://docs.google.com/document/d/1Ovi2ecDI2G75CecLr2tKs7W5a69Ntxo-9F-qaVW7kFI/edit#heading=h.kyru52g80m08
      • TODISCUSS
        • check with team: add cool down for unpassed GEPs
        • there should be some kind of "cool down" period before the (ammended) proposal is voted again depending on the percentage of votes against the proposal if it doesn't pass
          • e.g.
            • between 50 and 60 percent: 2 weeks cool down
            • under 50 percent: 2 months cool down
          • TODO
            • discuss cool down details
            • when ready we can submit the GEP
              • add forum post + GEP to dashboard (ops + comms circles)