This commit is contained in:
2025-10-11 11:35:55 +04:00
parent 5fda568403
commit 5187f695e1
13 changed files with 458 additions and 134 deletions

View File

@@ -1,34 +1,31 @@
---
sidebar_position: 2
sidebar_position: 3
---
# Implementation & Roadmap
:::info Community Update
This page shares what we know **right now** about the implementation status and roadmap. We're committed to transparency with the community, even when some details are still being finalized. More information will be shared as it becomes available.
This page shares what we know **right now** about the implementation status and roadmap.
**Join the discussion**: Share your feedback in the [forum thread](https://forum.threefold.io/t/tft-minting-transition-plan-community-e-book/4647).
:::
## Current Status Overview
We're making significant progress on multiple fronts to deliver a sustainable, farmer-friendly ecosystem. Here's where we stand on the key components mentioned in our recent community discussions.
---
## Token Economics: Proposed Solution
We've designed a comprehensive solution to the token economics challenge. The mechanisms are described in this e-book:
We've designed a comprehensive solution to the token economics.
- **Dual Token System**: TFT (tradable) and Cloud Credits (stable utility) - [Learn more](/core-concepts/token-system)
- **Controlled Liquidity**: Dutch auction mechanism prevents dumping - [Details](/core-concepts/dutch-auction-exit)
- **Fair Distribution**: Position-based pools reward long-term commitment - [Read more](/core-concepts/position-based-lp)
The system is designed and ready for implementation with the marketplace features below.
### Phase 2 : Q1 2026
- **Controlled Liquidity**: Dutch auction mechanism prevents dumping - [Details](/roadmap/dutch-auction-exit)
- **Fair Distribution**: Position-based pools reward long-term commitment - [Read more](/roadmap/position-based-lp)
---
## Marketplace Implementation 🚧
## Marketplace Implementation
### Stable Cloud Credit Currency
@@ -47,11 +44,6 @@ Cloud Credits (CC) provide the stable utility currency needed for day-to-day ope
farmers will be able to set their own pricing for capacity:
- **Flexible Pricing**: Set competitive rates for your node's resources
- **Market-Driven**: Respond to demand and differentiate your offerings
- **Integration**: Works alongside ThreeFold's standard bid packages
- **Transparency**: Clear pricing visible to potential customers
:::note
This feature is being designed to balance farmer autonomy with marketplace consistency.
:::
@@ -79,7 +71,7 @@ The slices system provides better node partitioning:
- **Clear Pricing**: Each slice has defined resources and pricing
- **Flexible Scaling**: Users can consume exactly what they need
This is part of the TFGrid v4 rollout. See the [Node Economics section](/node-economics/slices-overview) for detailed specifications and pricing.
This is part of the TFGrid v4 rollout.
---
@@ -102,41 +94,42 @@ A marketplace where users can bid on capacity and farmers can accept offers:
We're providing clear visibility into farmer economics:
- **Pricing Calculators**: Estimate income based on node specs - See [pricing models](/node-economics/pricing-model)
- **Pricing Calculators**: Estimate income based on node specs
- **Revenue Projections**: Min/max income scenarios documented
- **Cost Transparency**: Hardware costs amortized over 5-year lifespan
- **ROI Models**: Clear break-even and profit projections
The [Node Specifications](/node-economics/node-specifications) page provides detailed income projections for various node configurations.
---
## Dutch Auction Liquidity Pool
**Status**: Design Complete | Smart Contract Development in Progress
The controlled liquidity mechanism that protects the ecosystem:
- **Exit Controls**: Maximum 50% of contributed liquidity can exit via auctions
- **Fair Pricing**: Market-driven clearing price ensures fairness
- **Pool Protection**: Minimum discounts maintain pool sustainability
- **Margin Redistribution**: Remaining LPs benefit when others exit
Read the full [Dutch Auction Exit Mechanism](/core-concepts/dutch-auction-exit) for details.
---
## Infrastructure Development
### Kubernetes Cloud
### Mycelium Cloud
**Status**: Complete ✅
The Kubernetes cloud is operational and uses TFT underneath:
The Mycelium cloud is operational and uses TFT underneath:
- **Production Ready**: Deployed and available for workloads
- **TFT-Powered**: Runs on the token economics described in this plan
- **Waiting On**: Marketplace features above before major marketing push
> https://myceliumcloud.tf
### Whats next for Mycelium Cloud
- **More Nodes**: Expand the network with additional nodes
- Attach CC and minimal marketplace to it.
## Mycelium Network
**Status**: Complete ✅
The global Mycelium network is live and functional
### Whats next for Mycelium Network
- Need to add more nodes
- Invite more people to join
- Need to attach CC to it (basically the bandwidth should not be free but paid in CC, TFP underneath).
### TFGrid v4 & ZOS v4
@@ -162,13 +155,13 @@ We're expanding the network with quality infrastructure:
- **Goal**: More high-quality, high-performance nodes
- **Priority**: Significantly more GPU capacity for AI workloads
- **Partnerships**: Working with hardware providers and farmers
- **See**: [Certified nodes coming Q4 2025](/node-economics/node-specifications#certified-nodes-q4-2025) including dedicated AI configurations
- **See**: Certified nodes coming Q4 2025 including dedicated AI configurations
---
## End-User Applications
**Status**: Teams Working On It 🚀
**Status**: Teams Working On It
Applications being built on top of TFGrid:
@@ -187,31 +180,25 @@ Specific applications and partners will be announced as they reach appropriate m
### Who Are the Offtakers?
We're in discussions with several potential high-volume customers, but cannot share specific names at this stage due to:
We're in discussions with several potential high-volume customers, but cannot share specific names at this stage.
- **Confidentiality agreements** during negotiation phases
- **Competitive sensitivity** in the cloud services market
- **Deal contingencies** that haven't been finalized
- ICA is one of them, see http://ica.coop
- ThreeFold itself, we will be a significant user of capacity for its own operations and services as well as for its partners where we have direct relationships with.
### Why Can't We Share Details Yet?
Standard business practice in enterprise sales:
- Partners often require NDAs until public announcements
- Premature disclosure can jeopardize negotiations
- We want to announce confirmed commitments, not speculative discussions
ThreeFold will start to order capacity whenever minimal marketplace features are live.
### How Much Capacity Will They Take?
This depends on:
- orders of magnitude more than what's available today.
Requirements before we can get started:
- **Marketplace readiness**: Features listed above need to be live
- **Network capacity**: Sufficient GPU and high-performance nodes
- **Application maturity**: End-user apps that drive demand
- **Pricing competitiveness**: Market rates for comparable services
:::note Transparency Commitment
We will share offtaker information and capacity commitments **as soon as commercially appropriate**. This community's trust matters to us, and we're balancing transparency with business realities.
We will share offtaker information and capacity commitments **as soon as commercially appropriate**.
:::
---
@@ -249,12 +236,12 @@ We will share offtaker information and capacity commitments **as soon as commerc
| Token Economics Design | ✅ Designed | Awaiting implementation |
| Slices System | 🚧 Designed | Part of TFGrid v4 |
| Kubernetes Cloud | ✅ Running | Now |
| Dutch Auction Mechanism | 🚧 In Development | Q4 2024 |
| Marketplace Features | 🚧 In Development | Q4 2024 - Q1 2025 |
| TFGrid v4 / ZOS v4 | 🚧 In Development | 2-3 months |
| GPU Node Expansion | 🔨 Active Effort | Ongoing |
| End-User Applications | 🔨 Active Development | Q1-Q2 2025 |
| Offtaker Announcements | 🔒 Under NDA | When commercially ready |
| Dutch Auction Mechanism | 🚧 In Development | Q4 2024 |
| Marketplace Features | 🚧 In Development | Q4 2024 - Q1 2025 |
| TFGrid v4 / ZOS v4 | 🚧 In Development | 2-3 months |
:::tip Stay Updated
Join the discussion and get the latest updates as implementation progresses: