mycelium 0.x.x version, with dns, ... #29

Closed
opened 2024-03-21 10:40:27 +00:00 by despiegk · 4 comments
Owner

requirements

  • windows, osx, iphone, android client
    • mobile is flutter
    • desktop will be based on https://dioxuslabs.com/
    • switch on/off mycelium on all clients
    • see status to some chosen points (some ping test ?)
    • add peers to config
    • need to be usable, look feel ok, not too heavy
  • DNS proxy
  • Socks5 in Mycelium
  • manual how to install on the different platforms
  • reliable, it always reconnects
  • inside ZOS as base layer: access to ZDB, flists can be retrieved over Mycelium

todo

  • links to specs for DNS
  • links to specs for Socks5, need to see how users can allow/not allow people to use it
## requirements - [x] windows, osx, iphone, android client - mobile is flutter - desktop will be based on https://dioxuslabs.com/ - [ ] switch on/off mycelium on all clients - [ ] see status to some chosen points (some ping test ?) - [ ] add peers to config - [ ] need to be usable, look feel ok, not too heavy - [ ] DNS proxy - [ ] Socks5 in Mycelium - [ ] manual how to install on the different platforms - [x] reliable, it always reconnects - [x] inside ZOS as base layer: access to ZDB, flists can be retrieved over Mycelium ## todo - [ ] links to specs for DNS - [ ] links to specs for Socks5, need to see how users can allow/not allow people to use it
despiegk added the
Story
label 2024-03-21 10:40:27 +00:00
despiegk self-assigned this 2024-03-21 10:40:27 +00:00
despiegk added this to the (deleted) project 2024-03-21 10:40:27 +00:00
Owner
https://github.com/threefoldtech/mycelium/issues/128 needs to get resolved
despiegk modified the project from (deleted) to tfgrid_3_14 2024-05-22 07:56:24 +00:00
Author
Owner

we need minimal stability, update deadline

we need minimal stability, update deadline
despiegk removed their assignment 2024-06-04 12:22:54 +00:00
despiegk modified the project from tfgrid_3_14 to tfgrid_3_17 2024-07-28 07:43:05 +00:00
despiegk removed the
Story
label 2024-07-28 07:57:25 +00:00
despiegk changed title from mycelium 1.0.0 version to mycelium 0.5.x version, first good enough version for 10k users 2024-07-29 14:49:05 +00:00
thabeta modified the project from tfgrid_3_17 to tfgrid_3_15 2024-08-06 14:44:27 +00:00
Owner

clear responsibility here is needed

clear responsibility here is needed
despiegk modified the project from tfgrid_3_15 to tfgrid_3_17 2024-08-19 14:29:14 +00:00
despiegk changed title from mycelium 0.5.x version, first good enough version for 10k users to mycelium 0.x.x version, first good enough version for 10k users 2024-08-19 14:37:00 +00:00
despiegk changed title from mycelium 0.x.x version, first good enough version for 10k users to mycelium 0.x.x version, with dns, ... 2024-08-19 14:37:07 +00:00
Owner

will close this and start from the mycelium stability step by step

will close this and start from the mycelium stability step by step
Sign in to join this conversation.
No Milestone
No project
No Assignees
2 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: tfgrid/circle_engineering#29
No description provided.