mycelium 0.x.x version, with dns, ... #29

Open
opened 2024-03-21 10:40:27 +00:00 by despiegk · 3 comments
Owner

requirements

  • windows, osx, iphone, android client
    • mobile is flutter
    • desktop will be based on https://dioxuslabs.com/
    • switch on/off mycelium on all clients
    • see status to some chosen points (some ping test ?)
    • add peers to config
    • need to be usable, look feel ok, not too heavy
  • DNS proxy
  • Socks5 in Mycelium
  • manual how to install on the different platforms
  • reliable, it always reconnects
  • inside ZOS as base layer: access to ZDB, flists can be retrieved over Mycelium

todo

  • links to specs for DNS
  • links to specs for Socks5, need to see how users can allow/not allow people to use it
## requirements - [ ] windows, osx, iphone, android client - mobile is flutter - desktop will be based on https://dioxuslabs.com/ - [ ] switch on/off mycelium on all clients - [ ] see status to some chosen points (some ping test ?) - [ ] add peers to config - [ ] need to be usable, look feel ok, not too heavy - [ ] DNS proxy - [ ] Socks5 in Mycelium - [ ] manual how to install on the different platforms - [x] reliable, it always reconnects - [x] inside ZOS as base layer: access to ZDB, flists can be retrieved over Mycelium ## todo - [ ] links to specs for DNS - [ ] links to specs for Socks5, need to see how users can allow/not allow people to use it
despiegk added the
Story
label 2024-03-21 10:40:27 +00:00
despiegk self-assigned this 2024-03-21 10:40:27 +00:00
despiegk added this to the (deleted) project 2024-03-21 10:40:27 +00:00
Member
https://github.com/threefoldtech/mycelium/issues/128 needs to get resolved
despiegk modified the project from (deleted) to tfgrid_3_14 2024-05-22 07:56:24 +00:00
Author
Owner

we need minimal stability, update deadline

we need minimal stability, update deadline
despiegk removed their assignment 2024-06-04 12:22:54 +00:00
despiegk modified the project from tfgrid_3_14 to tfgrid_3_17 2024-07-28 07:43:05 +00:00
despiegk removed the
Story
label 2024-07-28 07:57:25 +00:00
despiegk changed title from mycelium 1.0.0 version to mycelium 0.5.x version, first good enough version for 10k users 2024-07-29 14:49:05 +00:00
thabeta modified the project from tfgrid_3_17 to tfgrid_3_15 2024-08-06 14:44:27 +00:00
Member

clear responsibility here is needed

clear responsibility here is needed
despiegk modified the project from tfgrid_3_15 to tfgrid_3_17 2024-08-19 14:29:14 +00:00
despiegk changed title from mycelium 0.5.x version, first good enough version for 10k users to mycelium 0.x.x version, first good enough version for 10k users 2024-08-19 14:37:00 +00:00
despiegk changed title from mycelium 0.x.x version, first good enough version for 10k users to mycelium 0.x.x version, with dns, ... 2024-08-19 14:37:07 +00:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
2 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: tfgrid/circle_engineering#29
No description provided.